GRENLEC rates at $0.36/kWh combined with frequent blackouts make solar a strong investment in Grenada. Sunchees ships hurricane-grade equipment CIF St. George's with full bilingual technical support.

Why solar in Grenada
Grenada sits in the Caribbean's high-irradiance band (5.5+ kWh/m²/day) with GRENLEC rates among the highest in the region. Solar payback is typically 4-5 years for homes, 3-4 years for hotels.
$0.36/kWh utility rate
GRENLEC charges among the highest residential rates in the Caribbean. Solar offsets directly.
Hurricane risk: Medium
Sunchees ships cat-rated mounting standard for Grenada based on geographic exposure.
Net Billing program
Sell excess solar back to the grid through GRENLEC's Net Billing program.
Best solar configurations for Grenada
Off-Grid
5 – 10 kW. For rural areas or unreliable GRENLEC service. Battery storage essential.
Hybrid
10 – 25 kW. Grid-tied with battery. Eligible for GRENLEC Net Billing.
Commercial / Hotel
50 – 200 kW. For tourism properties and businesses. Standard 3-phase commercial.
What matters for solar in Grenada
Voltage standard
Grenada uses 230V single-phase. Sunchees ships factory-configured for this — verify before ordering equipment from generic suppliers.
Hurricane exposure
Medium risk profile. We adjust mounting spec accordingly. Coastal installs always need marine-grade hardware.
Salt-air corrosion
Most Grenada properties are within 5km of coast. Anodized aluminum + IP65 inverters baseline.
Net Billing
GRENLEC interconnection process can take 4-8 weeks. We provide full technical documentation packet.
Typical Grenada solar pricing
| Size | Use case | Cost (USD) | Payback |
|---|---|---|---|
| 5 kW | Small home | $4,800 | 4-5 yrs |
| 10 kW | Family home + AC | $7,500 | 4 yrs |
| 25 kW | Small hotel / business | $18,000 | 3-4 yrs |
Pricing CIF St. George's. Excludes local installation labor. Add 15-25% for hurricane-grade upgrades on coastal installs.
Why customers choose Sunchees
Since 2008, we've shipped solar systems to 200+ countries from our 1,000 m² Foshan factory. Grenada buyers get the same direct-from-manufacturer pricing, warranty, and engineering support.
Founded 2008 · Foshan, China
Owned manufacturing facility. Direct factory — not a trading agent.
In-house inverter & lithium battery
No third-party brand mixing. Single point of warranty, lower failure rate.
System lifespan
Engineered for tropical climates. 5% liquidated damages on late delivery.
Customer rating
Across residential, commercial, agriculture, finance, transit, security deployments.
Delivery & production guarantees
- 1-10 sets sample order 5-7 working days
- 20-100 sets bulk 10-20 working days
- Late delivery penalty 5% of contract
- Production progress reports Dedicated PM
- Post-contract satisfaction follow-up Standard for every order
Warranty terms
- Solar panels 10 years (free replacement)
- Lithium battery 3 years (leak / deformation)
- Inverter & charge controller 2 years (PCB replacement)
- Combiner box 2 years
- System engineering support Lifetime remote assistance
Grenada solar guides
Country-specific articles will be added as published.
Real Sunchees installations in Grenada
Frequently asked questions
How much does a typical home solar system cost in Grenada?
Does GRENLEC have a net metering program?
How long is shipping from China to St. George's?
Can my system survive a hurricane in Grenada?
Get a Grenada solar quote on WhatsApp
Tap below to chat with our solar specialist. We'll send you a sized system, price, and shipping ETA within 24 hours.
Average response time under 30 minutes during Asia business hours. Send us your country, system size estimate, and any photos of your roof or current setup — we'll size and price it.

Home
You May Also Like

Tel
Email
Address